Tankwright
Glass tank cut list
Spec sheet
Project
Custom glass tank
1,200 × 450 × 500 mm
Tank
Finished outside dimensionsLength × depth × height, glass included
Already deducted from the panel sizes below
Side panels span the full depth; front and back fit between them.
25 mm below the rim
Freshwater
53.2 kg glass + 232 kg water
Cut list
10 mm glass · 2 mm joint| Panel | Cut to (mm) | Qty | Area | Glass |
|---|---|---|---|---|
Base Full footprint | 1,200 × 450 | 1 | 0.54 m² | 13.5 kg |
Left + right Full depth, on the base | 450 × 488 | 2 | 0.44 m² | 11.0 kg |
Front Fits between the sides | 1,176 × 488 | 1 | 0.57 m² | 14.3 kg |
Back Fits between the sides | 1,176 × 488 | 1 | 0.57 m² | 14.3 kg |
| Total · 5 panels | 2.13 m² | 53.2 kg | ||
Bracing & beads
Euro-brace frameA 70 mm frame around the whole top opening, bonded to all four panels. It holds the rim square and lets you leave the glass where it is.
| Brace strip | Cut to (mm) | Qty |
|---|---|---|
| Front + back rail | 1,176 × 70 | 2 |
| Side rail | 450 × 70 | 2 |
Where each wall meets the base — one continuous fillet, no joins.
Up each inside corner, including where the front and back meet the sides.
Both faces of every brace strip, so it works with the panel.
Workshop checklist
Tick each step as it is doneBefore you start
No silicone out yet
1.1Check the glass in
5 panels in 10 mm glass. Measure each one against the cut list and reject any chipped edge, shell chip or scratch across a joint face.
1.2Set the bench up
Flat, level and padded with card or foam, in a room above 15 °C. Lay out the silicone, gun, spatula, masking tape, 2 mm spacers and paper towels before any glass comes out of the wrapping.
1.3Dry-fit the whole set
Assemble the tank with spacers and no silicone. The outside must read 1,200 × 450 × 500 mm and both diagonals 1281.6 mm before you open a tube.
Silicone day
Work fast, keep it square
2.1Clean every joint face
Wipe with IPA or acetone and let it flash off. No dust, no fingerprints, no silicone on an uncleaned edge.
2.2Tape both sides of every joint
One run of masking tape each side, leaving the joint face open and the tape pressed flat. This is what gives you a clean bead line to peel back to.
2.3Bead with no gaps
A continuous bead of roughly 2 mm everywhere it is needed — about 5.3 m of silicone goes into this tank. Then set the panels in this order:
2.4Bead the side edges of the base
Run a full 2 mm bead along the left and right edges of the base, set in by half the glass thickness.
2.5Stand the two side panels
Left and right are the full-depth panels. Seat each in its bead and check it is plumb before the silicone skins over.
2.6Fit the front and back between the sides
Bead the front edge of each side panel, then slide the front and back in so they sit 1,176 mm long, inside the sides.
2.7Square it up
Both diagonals of the footprint must read 1281.6 mm. Slide the panels to correct it, never force them — once the skin forms it stays where it is.
2.8Tool the fillet and pull the tape
Run a smooth leg inside every joint, clear the excess, then pull the tape immediately while the silicone is still wet.
2.9Check the outside size
Finished outside must be 1,200 × 450 × 500 mm. If it measures over, the joints are too thick — take it apart and start again now.
Bracing
Euro-brace
3.1Cut the strips 70 mm wide
A 70 mm frame around the whole top opening, bonded to all four panels. It holds the rim square and lets you leave the glass where it is.
3.2Silicone the rails in after the fillet
Rails sit inside the top edge of the long panels, flush with the rim. Tape them until the silicone sets, then run a small fillet on the inside corner.
Cure and fill test
7 days, then water
4.1Leave it untouched
7 days at room temperature above 15 °C. No water, no lifting, no moving it by the panels.
4.2Fill in stages
Fill a third, check every joint, then fill to a water line 463 mm deep.
4.324-hour leak test
Stand it on a level surface with newspaper underneath. A seep means the tank comes apart and starts again — silicone does not seal itself once it has cured.
Materials to order
Euro-brace, cut from the same 10 mm glass
Panels and bracing with a 10% cutting allowance
Four base runs and four vertical corners
Notes for the shop
- Every size on this sheet is a finished size. The silicone joint is already deducted, so cut each panel exactly as listed.
- Polish the top edge on any panel that will be visible; flat-polish the edges that sit inside a joint.
- Assemble with a 2 mm bead and check the outside size is 1,200 × 450 × 500 mm before filling.
- Fill-test the tank on a level surface for 24 hours before it goes on the stand.